In September the GACC board voted to begin Phase 1 of pool renovations which include:
    1. Resurfacing the inside of the pool
    2. Re-coping and Tiling the pool
    3. Moving & tiling the lane lines to meet new USA Swim standards
We are pleased to report that in addition to these items we were able to add a bench seat in the shallow end of the pool and replace the light fixtures in the pool. Phase 1 is now complete.
The board is looking to move forward with Phase 2 of renovations focusing on redesigning the baby pool area. We are waiting on the drawings but hope to begin this Winter/Spring in order to have it completed by summer.